SFGTV
Dec 1, 2012 4:30pm PST
is 181 fremont street. third presentation in 16 hours so karen brodak before you on 181 fremont street. the item before you is discussion and possible action to recommend to the planning commission the net shadow pr proposed 181 fremont will not have adverse impact on use of union square pursuant to planning code section 295, the sunlight ordinance. b, portion be allocated to the proposed project 181 fremont street and adopt finding under the california environmental quality act and adopt mitigation monitoring and reporting. we presented this item for review at the capital committee. we are speaking on the same presentation. we provided a bit more information as you received, an additional attachment under attachment e. you received updated exhibit 1 also under e. so full packet should be available to you. i should be able to do a presentation. joined by kevin guy from the planning department. if you have questions for him as well. thank you. >> as you can see this is a map of the transit center district plan that this commission also reviewed with the planning commission in october. t
SFGTV
Dec 13, 2012 9:00pm PST
, but it continues to move west to east and under fremont street is the next step. the access trestle was completed all the way to fremont street. so the contractors now have a construction roadway, so to speak all the way out to howard at the end of the west end of the project. the awss work continues on mission street. they were able to get an exemption from the holiday moratorium to allow them to continue that work. so we'll finish that early part of next if year as they work through the holidays on mission continuing to put in the new water line. coming up next, the below-grade structure contractor who now has the geothermal and grounding contracts within their package will start that work in january. the buttress work will continue and the micro pile production, they completed 70 in the total production piles and that will hopefully be completed in the next 90 days and move into zone 2. of course the excavation will continue to work from west to east of the timeline update still remains the same.we're starting the below-grade package and superstructure package is out to bid and we'll get the
SFGTV
Dec 17, 2012 4:00pm PST
that the trustle bridge is connected all the way to fremont street and the other areas continue to be under excavation and the buttress area at the east end. this gives you a breakdown of how the excavation is going. the dark photo, left side indicates making the final depth and they are continuing that dealing with the de-watering aspects from the rain and moves from west to east. so just some perspectives of how things have changed. you can see how the trest the bridge is now connected. hard to tell, but the ab and c levels are in place in zones 1 and 2 and at far end, all the way down to the d level. just a shot of some of the excavation and bracing going on and the conditions which the contractor is working under right now in zone 1. micro piles continue. they have 70 completed to-date, or by the end of november. installing bracing, under the 1st street bridge between zones 2 and 3. completing the trestle in zone 3. and excavation and bracing in zone 3 as it progresses along. the end section, the east end section, zone 4 buttress work continues. as i said they met the milestone of 162
SFGTV
Dec 7, 2012 8:30am PST
is 181 fremont street. third presentation in 16 hours so karen brodak before you on 181 fremont
SFGTV
Dec 22, 2012 10:30pm PST
zones 2 and 3 on eastside of the fremont street. this will allow them to start the excavation underneath the fremont street bridge and start moving into that zone 4 portion of that zone 4 excavation early before the completion of buttress work. so that shoring wall went in or that cutoff wall went in this last period and will allow them to start excavating under the bridge. the awss work continues. as i mentioned there is just a couple of shots of the work progressing on mission street and the integral work around the other utilitis in the streets. so next up is the substructure package as i mentioned. so we'll just walk through that real quick. the shoring walls are already completed. you might have seen the slides before, the water table. the next step is the micro piles and there are a total of close to 1800 of them, the length of the project, but as they are completed the contractor, who is starting with the grounding and geothermal in january, underneath this will be installing the 5' thick piece of concrete. then the below-grade structure and the walls and the foundation or stru
SFGTV
Nov 30, 2012 10:30pm PST
as the 80 fremont ramp in the far distance. and the percent for art piece, this is a representation, we worked with the arts commission to identify something in particular here, but it sort of is a marker and icon in the space. the plaza itself as i mentioned is quite flexible and simple. there are some dedicated seating spaces that are multi-sided so that the users can integrate with the plaza as well as with the park. we have a play space nearby that is intended to be engaged. another view looking from tehama space across the plaza. >> commissioners, we want to be rerespectful of your time. we're going over a couple minutes. if i can put the video back up for just a moment. briefly stated you can see some slides on the economic contribution of this project to the city and county of san francisco [speaker not understood] $6 million. taxes between 18 and $38 million on an annualized basis for 10 years whether it's a rental or for sale. i'm going to go through these very, very quickly. i think you probably are a little more interested in learning about the community outreach we've done.
SFGTV
Dec 1, 2012 10:30am PST
within 20-minute walk, we all know what the behavior of people who are going to get off at fremont and harrison, circle close and expand out from there. those people are coming in just as everybody else is trying to get out. it's going to create complete chaos. [speaker not understood]. the behavior is going to be different than giants fans who can be trained to take transit. i'll submit the rest of my comments to you. speaker kim. >> thank you. thank you, mr. [speaker not understood]. >>> good afternoon, walter [speaker not understood] with the carpenters. through the city, you see a lot of work going on, you see the sky cranes. there are still a lot of people not working. these people are ready to go to work. we have a [speaker not understood] right now ready to go to work with all trades. san francisco needs the arena, san francisco needs the warriors, san francisco needs the work. >> thank you. >>> [speaker not understood], with the south of market business association. [speaker not understood] and we have a good chance to have a jewel added to the city that we live in. i think